• images/stories/top/11.jpg
  • images/stories/top/12.jpg
  • images/stories/top/14 copy.jpg
  • images/stories/top/14.jpg
  • images/stories/top/22.jpg
  • images/stories/top/33.jpg
  • images/stories/top/44.jpg
  • images/stories/top/55.jpg
  • images/stories/top/6.jpg
  • images/stories/top/66.jpg
  • images/stories/top/7.jpg
  • images/stories/top/77.jpg
  • images/stories/top/8.jpg
  • images/stories/top/88.jpg
  • images/stories/top/9.jpg
  • images/stories/top/99.jpg

Kazakhstan

List of Projects (Kazakhstan)

Year Name Client General information Status
2004-2006 Renovation of Makat, Kulsary, Beyneu, Inder (GPA-10) compressor stations. Customer: “Energy Fund” Company Renovation of Makat, Kulsary, Beyneu, Inder (GPA-10) compressor stations. Atyrau area, Kazakhstan Completed
2004 Construction of underwater crossing through Ural River (diameter 56”, length 1 km). Customer: “Energy Fund” Company. Construction of underwater crossing through Ural River (diameter 56”, length 1 km). Atyrau area, Kazakhstan. Completed
2003 Installation and construction works and repair-and-renewal operations at the looping of CAC-IV gas pipeline (diameter 1400 vv, length 16 km). Customer: “Energy Fund” Company. Installation and construction works and repair-and-renewal operations at the looping of CAC-IV gas pipeline (diameter 1400 vv, length 16 km). Atyrau area, Kazakhstan. Completed
2000-2002 Renovation of CAC-IV – CAC-V gas pipeline (diameter 1400 – 1200 mm, length 61 km). Customer: “Energy Fund” Company. Renovation of CAC-IV – CAC-V gas pipeline (diameter 1400 – 1200 mm, length 61 km). Atyrau area, Kazakhstan. Completed