Key experience

Project name: Environmental projects development including waste water treatment plant construction, sewerage system and water cooling towers reconstruction at the Turkmenbashi oil processing complex.

Year: 2013-2018

Customer: “Turkmenbashi oil processing complex”

Description: The major activities associated with the engineering, procurement and “turn-key” construction:

  • industrial waste water treatment facilities for the first system with processing capacity of 900 m3/hr;
  • industrial waste water treatment facilities for the second system with processing capacity of 300 m3/hr;
  • domestic water treatment facilities with processing capacity of 26 m3/hr.
  • water cooling towers with processing capacity of 400, 500, 800 m3/hr. respectively for refinery crude oil distillation units;
  • oily sludge treatment unit with processing capacity of 2 m3/hr;
  • pressurized industrial and domestic water sewerage system with capacity of 1226 m3/hr;
  • maximum permissible discharges project for refinery;
  • maximum permissible emission project for refinery;
  • ecological passport for refinery;
  • waste placement limits project for refinery.

Turkmenistan, Balkan Velayat.


Project name: Off-site facilities design and construction at the Turkmenbashi oil processing complex.

Year: 2013

Customer: “Turkmenbashi oil processing complex”

Description: The major activities associated with the engineering, procurement and “turn-key” construction:

  • boiler house with steam processing capacity of 70 t/hr;
  • water treatment plant with steam processing capacity of 105 t/hr;
  • air compressed station with processing capacity of 16500 nm3/hr;
  • nitrogen generation plant with processing capacity of 1586 nm3/hr;

Turkmenistan, Balkan Velayat.


Project name: Design and construction of dehydration plant “Bagtyyarlyk-2”.

Year: 2013-2017

Customer: State Concern “Turkmengas”

Description: The structure of the technological area includes the following technological facilities:

  • Production line for drying;
  • Unit for condensate collecting;
  • Flare system;
  • Automatic gas distribution station Each production line with capacity of 15 mln.nm3/day consists of the following equipment
  • Adsorbers with valve blocks for each adsorber – 6 units; (capacity of each unit is 3.5 mln.nm3/day);
  • Furnace blocks: valve block for fuel lines, valve block for product lines, valve block for metering lines – 1 unit;
  • Gas cooler – 1 unit;
  • Separator unit – 1 unit;
  • Filter unit – 1 unit;
  • Block buffer tank division – 1 unit;
  • Gas metering unit – 1 unit.

Project name: EPIC of Stand Alone Export Oil Treatment Facilities

Year: 2011-2017

Customer: State Concern “Тurkmennebit”, Operator: “Consortium Khazar”

Description: According to the contract PETRO GAS Company has committed for engineering, procurement and construction of oil treatment facilities on oilfield Eastern Cheleken, which is operated by State concern Turkmennebit. Facilities designed for treatment capacity 500-3000 cubic meter emulsion which can contain 50% water and near 1000000 cubic meter gas per day. Quality of treated oil should meet TDS/GOST 9965-76 requirement for 1 group export oil.

The main points of project are:

  • Oil Storage Vertical Tank 3×5000 m3
  • AKER Oil Treatment Equipment:
  • Two “Slug Catcher” units, with 19 000 BPD capacity each, Fuel Gas Scrubber, Two “Heater-Treater” units, with 19 000 BPD capacity each, Degassing Boot.
  • Fuel Gas Compressor Unit 373 kW
  • Gas Turbine Power Generator 3800 kW (Solar® Turbines)
  • Two trunk line oil heaters 3400 kW
  • MVSW(6,3 kV) & LVSW(0,4 kV) Schneider Electric switchboard equipment.
  • Honeywell Distribution Control System C-300/Emergency Shutdown System

Turkmenistan, Balkan Velayat. Oilfield “Eastern Cheleken”


Project name: 56” Trunk gas-line Malay-Bagtyyarlyk, gas dewatering
facility, accounting-measurement unit

Year: 2013

Customer: State Concern “Turkmengas”

Description: Gas dewatering facility with capacity of 21.9 billion m3/year installation on Malay-Bagtyyarlyk gas-line.

  • Gas-line part installation (scraper receiving unit).
  • Pipeline route (56”, length – 107,2 km)
  • Topographical and geological surveys of 140 km total length.
  • Hydro meteorological survey on linear section, length 184,5 km

Turkmenistan, Lebap Velayat


Project name: EPIC Project – 30” trunk pipeline and 2 infield lines.

Year: 2009-2013

Customer: “Dragon Oil” (Turkmenistan) Ltd.

Description: Dragon Oil (Turkmenistan) Ltd., operator of the existing oil field in Cheleken Contract Area, Turkmenistan, modifies the existing oil-and-gas production, transportation and refining systems. Under the modifications, Dragon Oil (Turkmenistan) Ltd. negotiated the contract with PetroGas FZE for EPIC of new 30” trunk-line and two sub-sea infield pipelines.

Dragon Oil (Turkmenistan) Ltd., operator of the existing oil field in Cheleken Contract Area, Turkmenistan, modifies the existing oil-and-gas production, transportation and refining systems.
Under the modifications, Dragon Oil (Turkmenistan) Ltd. negotiated the contract with PetroGas FZE for EPIC of new 30” trunk-line and two sub-sea infield pipelines.

  • Installation of a new 30” trunk line connecting Block 2 platform and NPSF (length – Offshore 29 km and Onshore 10 km).
  • Installation of 4 nos. 12” Sub-sea tie-ins on the new 30” trunk line.
  • Installation of intra-field 18” Sub-sea flow line from LAM 28 platform to LAM A plat- form (length – Offshore 5 km).
  • Installation of intra-field 20” Sub-sea flow line from LAM A platform to Block 2 platform (length – Offshore 5 km).
  • Installation of Pig Launcher at LAM 28 platform and Pig Receiver at LAM A platform for 18” pipeline.
  • Installation of Pig Launcher at LAM A platform and Pig Receiver at Block 2 platform for 20” pipeline.
  • Installation of Pig Launcher at BLOCK-2 platform and Pig Receiver at NPSF for 30” pipeline.

Caspian Sea shelf, Turkmenistan.


Project name: 1400mm gas pipeline “Malay-Bagtyyarlyk”

Year: 2008-2009

Customer: General Customer: State Concern “Turkmengas”

Description: 1400mm gas pipeline “Malay-Bagtyyarlyk”, length 107,2 km. Lebap velayat, Turkmenistan.

Turkmenistan
completed 58 projects

Read more

map turkmenistan
Kazakhstan
completed 4 projects

Read more

map Kazakhstan
Uzbekistan
completed 1 project

Read more

map Uzbekistan